Dealer Plan

Tel: 400-057-8640
Phone: +8615356834675
Working hours: Monday to Friday 9am to 5pm

Mismi (China) Supply Chain Headquarters Center Park Project

The Application of Polpaisi Steel Fiber in Logistics Warehousing - Mismi (China) Supply Chain Headquarters Center Park Project


Since its establishment in Japan in 1963, MISUMI has been committed to providing customers with various high-quality parts such as FA factory automation parts, mold parts, electronic parts, and tool consumables quickly and accurately.

The Mismi (China) Supply Chain Headquarters Center Park Project is located at 188-2 Diling Road, Fengxian District, Shanghai, with a construction area of approximately 63000 square meters. It was constructed by Shanghai Construction Engineering Seventh Construction Group Co., Ltd.

ee72dc5343f5ee7156490cca9466715.jpg


ee72dc5343f5ee7156490cca9466715.jpg

The structural floor slab of this project adopts a steel truss floor support plate without supporting formwork system, and the floor slab adopts the Polpaisi SF 65/60 BP steel fiber concrete one-time forming construction process, effectively controlling the floor cracking caused by yield deflection deformation of the floor slab and concrete stress shrinkage, and successfully solving the quality problems such as easy cracking, bulging, and layering in the leveling layer process of the floor slab secondary forming.



     The steel truss floor support plate combined with Bolpei steel fiber reinforced concrete one-time forming floor and floor system improves the overall integrity of the floor, ensuring structural safety and effectively controlling floor cracking, enhancing the impact resistance of the floor and making it more durable.